Hitler 2nd Causeway rant

212 views 8/7/2014
The last workshop for the SPI 2nd Causeway Access Project Is complete. There are two proposals on the table. One, to expand the original causeway into 3 lanes. Two, to build a second causeway between Holly Beach and the Grassy Bank between SPI access 5 and 6. tearing through the sensitive ecosystem of the Luguna Madre. They surely will go with the 3 lane expansion
No comments yet.